| Date |
Project Title |
| Contract No. DPW 01/2022 - Excavation of Inspection Pits and Underground Utility Survey for Minor Drainage Improvement Works in Repulse Bay, Stanley and Sha Tin |
| Contract No. CM 12/2021 - Trial Pit and Utility Survey for Agreement No. CE 2/2019 (DS) Construction and Rehabilitation of Sewage Rising Mains in Southern District |
| MS/2022/03 - Desilting for Cherry Street Box Culvert under Southern Side of Cherry Street Park |
| PR/2022/03 - Trial Pit Surveys for Underground Sewers and Stormwater Drains in North, Sha Tin and Tai Po Districts |
| HKI/2022/02 - Condition Survey of Rising Mains at Tsung Pak Long, Yeung Long and Tin Shui Wai |
| 16/WSD/21, and 17/WSD/21 - Leak Detection for Water Main in Hong Kong and Outlying Islands and New Territories West |
| Inspection of Buried Water Carrying Services affecting slopes along Residence Road, The Chinese University of Hong Kong |
| PR/2021/18, PR/2021/33, and PR/2021/35 - Pipe Cleansing and Condition Surveys On Drains and Sewers in Kowloon East, Kowloon Central, and Kowloon West |
| MN/2021/09 - Pipe Cleansing and Condition Surveys on Drains and Sewers in North District West |
| MN/2021/08 - Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Tai Po East |
| DC/2020/03 - Robotic Inspection to Tseung Kwan O Sewage Tunnel |
| DC/2020/03 - Desilting works at River Silver, Mui Wo (梅窩銀河清理淤泥工程) |
| MN/2021/06 - Desilting of Tuen Mun River near Tuen Ma Line Tuen Mun Station |
| Contract No. PR/2021/02 - Sewer/Stormwater Drain Rehabilitation near Lok Shan Road |
| Contract No. SM 06/2021 - Terrestrial Laser Scanning, Utility and Tree Surveys for Dry Weather Flow Interceptor at Causeway Bay |
| Contract No. SM 05/2021 - Terrestrial Laser Scanning, Utility and Tree Surveys for Dry Weather Flow Interceptor at Hung Hom |
| Contract No. MS/2020/19 Sewr / Stormwater Drain Rehabilitation in Sheung Kwai Chung |
| Contract No. PM 09 to 13/2020 - Engineering Inspection for Underground Stormwater Drains and Sewers in Shatin (South); Shatin (North); Eastern, Southern and Islands; Central & Western and Wan Chai; Tai Po (Southwest); Tai Po (Northwest); Tai Po (East) and Sai Kung; Tai Po (East) and Sai Kung |
Contract No. MS/2020/21 to 25 - Pipe Cleansing and Condition Surveys on Drains and Sewers in Ma On Shan; Tsuen Wan East and Kwai Tsing East; Tsuen Wan West and Kwai Tsing West; Sham Shui Po and Yau Ma Tei; Mong Kok
|
| Contract No. CM03/2020 - Topographical and Utility Survey for North East New Territories Sewerage System Upgrade |
| Contract No. DP07/2020 - Non-destructive Utilities Survey for Drainage Improvement Works in Sai Kung and North District |
| Contract No. MS/2019/13_- Sewer Rehabilitation at Salisbury Road between Mody Road Garden and Science Museum Road |